Loader
Latest News
HR1047: GRID Power Act
20126
wp-singular,page-template-default,page,page-id-20126,wp-theme-bridge,bridge-core-3.3.4.9,qode-optimizer-1.2.3,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1400,side_menu_slide_from_right,qode-theme-ver-30.8.9.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-9.0.1,vc_responsive
 

HR1047: GRID Power Act

119th Congress (2025–2027) · House bill · Sponsor: Rep. Balderson, Troy [R-OH-12]


Key facts

Item Detail
Roll-call votes 1
Chamber House
Latest vote 2025-09-18: Passed
Latest action 2025-09-19: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Policy area Energy
Official record Congress.gov

What the bill does

Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act This bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects). Under the bill, dispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid. First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably. Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource…

Subjects: Electric power generation and transmission, Energy efficiency and conservation, Energy storage, supplies, demand


Roll-call votes on HR1047 (119th Congress)

Every recorded vote on this bill, newest first, with a link to the official tally. Member-by-member positions are on each member’s profile.

Date Chamber Question Result Yea Nay Not voting Record
2025-09-18 House Yea-and-Nay Passed 214 206 8 Official tally

Frequently asked

What is HR1047 in the 119th Congress?

HR1047 (GRID Power Act) was introduced in the 119th Congress (2025–2027) by Rep. Balderson, Troy [R-OH-12].

What is the latest action on HR1047?

On 2025-09-19: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

How many roll-call votes were held on HR1047?

1 recorded vote in the 119th Congress. The most recent, on 2025-09-18, was "Yea-and-Nay": Passed.