Loader
Latest News
HR3080: Water Resources Reform and Development Act of 2014 (113th Congress)
20339
wp-singular,page-template-default,page,page-id-20339,wp-theme-bridge,bridge-core-3.3.4.9,qode-optimizer-1.2.3,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1400,side_menu_slide_from_right,qode-theme-ver-30.8.9.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-9.0.1,vc_responsive
 

HR3080: Water Resources Reform and Development Act of 2014

113th Congress (2013–2015) · House bill · Sponsor: Rep. Shuster, Bill [R-PA-9]

This page covers HR3080 in the 113th Congress. Bill numbers start over every Congress, so HR3080 in another Congress is a different bill.


Key facts

Item Detail
Roll-call votes 1
Chamber Senate
Latest vote 2014-05-22: Conference Report Agreed to (91-7, 3/5 majority required)
Latest action 2014-06-10: Became Public Law No: 113-121.
Policy area Water Resources Development
Official record Congress.gov

What the bill does

(This measure has not been amended since the Conference Report was filed in the House on May 15, 2014. The summary of that version is repeated here.) Water Resources Reform and Development Act of 2014 – Title I: Program Reforms And Streamlining – (Sec. 1001) Revises requirements for feasibility studies initiated under the Water Resources Development Act of 1986 (WRDA of 1986) to: (1) require a final report on a study not later than three years after its initiation; (2) limit the maximum federal cost of any such study to $3 million; and (3) require personnel of the Army Corps of Engineers (Corps) to conduct concurrent reviews of feasibility studies (currently, sequential reviews are permitted). Requires the Secretary of the Army, not later than 30 days after making a determination that a feasibility study will not be conducted in accordance with such limitations, to: (1) prepare an updated feasibility study schedule and cost estimate, (2) notify the non-federal feasibility cost-sharing partner that the study has been delayed, and (3) provide written notice to the House Committee on Transportation and Infrastructure and the Senate Committee on Environment and Public Works (congressional public works committees) explaining the reasons for noncompliance. Terminates the authority for any feasibility study that is not completed within one year after the Secretary makes a determination of noncompliance, except that the Secretary may extend the timeline of a feasibility study for up to 3 years if the Secretary determines that the study is too complex to comply with the time and…

Subjects: Administrative law and regulatory procedures, Administrative remedies, Advanced technology and technological innovations, Advisory bodies, Agricultural conservation and pollution, Alabama, Alaska, Alternative and renewable resources, American Samoa, Aquaculture


Roll-call votes on HR3080 (113th Congress)

Every recorded vote on this bill, newest first, with a link to the official tally. Member-by-member positions are on each member’s profile.

Date Chamber Question Result Yea Nay Not voting Record
2014-05-22 Senate On the Conference Report H. R. 3080 Conference Report Agreed to (91-7, 3/5 majority required) 47 2 1 Official tally

Frequently asked

What is HR3080 in the 113th Congress?

HR3080 (Water Resources Reform and Development Act of 2014) was introduced in the 113th Congress (2013–2015) by Rep. Shuster, Bill [R-PA-9].

What is the latest action on HR3080?

On 2014-06-10: Became Public Law No: 113-121.

How many roll-call votes were held on HR3080?

1 recorded vote in the 113th Congress. The most recent, on 2014-05-22, was "On the Conference Report H.R. 3080": Conference Report Agreed to (91-7, 3/5 majority required).