HR3632: Power Plant Reliability Act of 2025
17761
wp-singular,page-template-default,page,page-id-17761,wp-theme-bridge,bridge-core-3.3.4.9,qode-optimizer-1.2.3,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1400,side_menu_slide_from_right,qode-theme-ver-30.8.9.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-9.0.1,vc_responsive
 

HR3632: Power Plant Reliability Act of 2025

119th Congress (2025–2027) · House bill · Sponsor: Rep. Griffith, H. Morgan [R-VA-9]


Key facts

Item Detail
Roll-call votes 2
Chamber House
Latest vote 2025-12-16: Passed
Latest action 2025-12-17: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Policy area Energy
Official record Congress.gov

What the bill does

Power Plant Reliability Act of 2025This bill modifies the process that the Federal Energy Regulatory Commission (FERC) uses to determine, upon a complaint from a state commission, whether a public utility (i.e., power plant) must remain open because the retirement of the power plant will make the bulk power system unreliable, including by allowing transmission organizations to also file complaints with FERC. If FERC finds that any interstate service of any public utility is inadequate or insufficient, or is likely to become inadequate or insufficient within five years of receiving such complaint, then FERC must determine the proper, adequate, or sufficient service to be furnished through an order, rule, or regulation (order). The bill specifies that FERC may order a power plant to remain open for up to five years. Any affected state commission, transmission organization, or power plant may request that FERC extend such order. A FERC order must determine (1) any rate or charge necessary to provide compensation for the additional costs of the service, and (2) the cost allocation of any rate or charge. A power plant owner or operator must notify FERC and affected state commissions or transmission organizations at least five years before any planned retirement of a unit of an electric generating facility except in the case of an emergency or similar event that renders a unit inoperable. The bill exempts from federal, state, and local environmental laws and regulations any action taken by a generating facility to comply with such orders.

Subjects: Alternative and renewable resources, Congressional oversight, Dams and canals, Electric power generation and transmission, Energy prices, Energy storage, supplies, demand, Government information and archives, Government studies and investigations


Roll-call votes on HR3632 (119th Congress)

Every recorded vote on this bill, newest first, with a link to the official tally. Member-by-member positions are on each member’s profile.

Date Chamber Question Result Yea Nay Not voting Record
2025-12-16 House Yea-and-Nay Passed 220 202 9 Official tally
2025-12-16 House Yea-and-Nay Failed 207 216 8 Official tally

Frequently asked

What is HR3632 in the 119th Congress?

HR3632 (Power Plant Reliability Act of 2025) was introduced in the 119th Congress (2025–2027) by Rep. Griffith, H. Morgan [R-VA-9].

What is the latest action on HR3632?

On 2025-12-17: Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

How many roll-call votes were held on HR3632?

2 recorded votes in the 119th Congress. The most recent, on 2025-12-16, was "Yea-and-Nay": Passed.